〉 Wide Panel Mould
〉 PE + WPC mould
〉 PVC + WPC mould
〉 UPVC Window and Door Profile Mould
〉 Pipe Mould
〉 Color Co-extrusion/ Multi-material Co-extrusion Mould
〉 UPVC Profile Mould
〉 Multi-cavity High Speed Mould
〉 Foaming Mould
〉 ABS, PP, PE, PC, PMMA Moulds
〉 Production Machine
〉 Soft PVC Extrusion Mould
  • WPC plastic profile plastic die extrusion
  •  WPC door panel mould for sale
  • PVC strip Extrusion die
  • PVC WPC Panel Extrusion Mold Die
  • Upvc Window Frame Profiles Extrusion Mould
  • pvc grill panel mold
  • 〈
  • 〉

Your Position: Home > NEWS

TianRui Order Fulfillment Process

2017-09-01

 client

•Technical design of the product

•Describle the connecting size and raw material


Supplier

•Technical concept

•Offer

•Tell the client the debugging can only be finished in the client plant


Client

•confirm the offer and decide not to debug or accept the debugging in his own plant

Supplier

•confirm the offer and decide not to debug or accept the debugging in his own plant

Client

•pay off the deposit

Supplier

•confirm the receipt of the deposit and offer the final drawing/details for client's confirmation

Client

•sign the drawing and email back to the supplier

Supplier

•start to making the moulds

•finish the moulds and notice the cusotmer

Client

• pay off the balance

Supplier

• confirm the receipt of the balance and anrrange the delivery according to Client's request

Client

• receive the moulds and ask for engineer support in buyer's plant

• pay off the cost of the transfortation/visa fees,PREPAID 15 DAYS salary of the engineer to the supplier

Supplier

• send the engineer to the cient's plant and support on the production

• engineer come back to home once the production is OK

• Supplier count the total cost of the engineer, send back the suplus to the client or the client pay off the balance.

Pre:TianRui Company Advantages

Next:Integrated wall